INSTALLING HIGH-SPEED CHARGERS ACROSS THE MIDLANDS AND NORTH OF ENGLAND

Lantei were contracted to install approximately twenty-five electric vehicle charging points for a premium automotive manufacturer, from drawing to commissioning.

Upon completion of the survey, we conducted a week-long load test of the Low Voltage Network, ensuring stability prior to installation works. Our technical department held a pre-start meeting, proposing locations for each charger and upon approval, the wheels were set in motion.

We were given the green light and completed CAT and Gen surveys for the installation of the car park cables. Our engineers excavated the channels to each charger, from the main building to the charger location, installing the cable ducts every twenty metres. As the civil works reached completion, the cables were installed, rooted to the mains panel, and connected to the externally situated chargers.

The high-speed charge points were then installed to the fresh concrete plinths, connected by five pin commando sockets. Our use of O-PEN fault monitoring technology within each charger negates the requirement of earth rods completely. The last step was to perform a final check of all installation works, providing full demonstrations. 

EV Case Study no company banner

THE OUTCOME

We completed the project within the allotted timescale and budget, creating beautifully designed charge points across each site. This was no ordinary installation job, as we employed the innovative fault monitoring technology. Each material decision was made to reflect the premium status of our client.

Our service is not just centred on the installation itself, but the attention to detail. Our team performed checks prior to beginning and after completing the works, ensuring a fully functioning network of chargers were present on site. Providing the demonstration is integral to our quality of service, delivering an all-encompassing project managed service, from the survey to the switch on.

OTHER CASE STUDIES

St Georges thumbnail
hyde group case study picture
itt in case study picture
Altius logo
ISO 9001 Logo
ISO 14001 Logo
BIFM Logo
Chas Logo
Constructionline logo
ECA Logo
Investors in People logo
Living wage logo
NICEIC Logo
Q41-QMS-OHSAS-18001 logo
Safe Contractor Logo
Lantei White Logo

© 2022 Lantei Ltd. All rights reserved.

Aussie Play Casino brings you the excitement of the outback! Start your winning streak at Aussie Play Casino.

Experience the glitz of Vegas from your home in Australia with Playfina Casino. Start your winning streak now!

BUSINESS HOURS

Our support hotline is available
5 days a week

Monday - Friday
8:30am - 5:00pm